High­land Park Mid­dle School — Mechan­i­cal Upgrades

K-12 Schools

This design-build project involves the replacement of all domestic water piping throughout the school. Construction will occur over the summer break in 2017.


Owner:  Beaverton School District

Engineer:  MFIA Consulting Engineers